{"product_id":"njk-no-211-long-lead-pencil-sharpener","title":"NJK No. 211 Long Lead Pencil Sharpener","description":"\u003cp\u003eA handheld sharpener designed to sharpen to a long point similar to that created by electric pencil sharpeners, the NJK No. 211 is crafted from recyclable aluminum and rice resin. Interior sharpening blade can be replaced. Designed to be easily held and to facilitate enjoyable sharpening, NJK has crafted a minimalistic design to encourage a prolonged affection for the act of sharpening your pencils, and to be honest, this one makes a near-perfect long point.\u003c\/p\u003e\u003cp\u003eSold individually. Made in Japan.\u003c\/p\u003e","brand":"NJK","offers":[{"title":"Default Title","offer_id":48896823066777,"sku":"SQ4393698","price":25.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0681\/4239\/9641\/files\/IMG_7156.jpg?v=1787036008","url":"https:\/\/shop.gentlemanstationer.com\/products\/njk-no-211-long-lead-pencil-sharpener","provider":"The Gentleman Stationer","version":"1.0","type":"link"}